The strategy of the investment industrial group AES Group corresponds to the Energy Strategy of Ukraine and develops renewable energy sources (RES) to gradually replace the traditional generation.
AES Group’s green documents is 10.1 MW and is represented by solar power plants with a capacity of 3.9 MW, 2.2 MW and 4 MW, which are located in the Kharkiv region.
Thanks to this activity, we have created 33 jobs, we regularly pay taxes to the state and local budgets – more than UAH 3.5 million in 2020.
The production of electricity from solar generation significantly reduces harmful CO2 emissions into the atmosphere and contributes to the improvement of the ecological state of the region.
The long-term development plan of the RES direction provides for the construction of another solar power plant with a capacity of 8 MW.
Industrial ground solar station with a capacity of 3.9 MW in the Kharkiv region, Merefa
Electricity generation is provided by:
– 13680 pcs. polycrystalline PV modules Talesun (China) with a power of 325 W each
– 144 inverters Fronius (Austria).
OSR – JSC “Kharkovoblenergo”.
Enterprise website: https://aessolar.com.ua/
Industrial ground-based solar station with a power of 4 MW on Solovyina street 1B, in the village. Borki, Zmievsky district, Kharkiv region.
Electricity generation is provided by:
– 14060 pcs. polycrystalline PV modules Talesun (China) with a power of 330 W each
– 148 inverters Fronius (Austria).
OSR – JSC “Ukrzaliznytsya”.
Enterprise website: http://borkisolar.pp.ua/
Industrial ground-based solar station with a power of 2.2 MW on Zheleznodorozhnaya street, 37B in the village. Railway Borki, Zmievsky district, Kharkiv region.
Electricity generation is provided by:
– 7695 pcs. polycrystalline PV modules Talesun (China) with a power of 330 W each
– 81 inverters Fronius (Austria).
OSR – JSC “Kharkovoblenergo”.
Website: http: //solarsolutions.pp.ua/